⚠️ The UK’s Renewable Energy Strategy is a Disaster in the Making!
The government and developers are forcing huge solar and battery farms onto floodplains, bog land, hills, and former landfill sites, claiming it’s the best way to transition to green energy.
🔴 But the reality? These projects are an environmental and financial nightmare!
💷 Higher energy bills for consumers
🌳 Destruction of farmland and countryside
⚠️ Risky floodplain developments
⚡ Grid inefficiencies & wasted power
🚨 WE NEED TO ACT NOW TO STOP THIS! 🚨

🔎 THE PROBLEM: BADLY PLANNED SOLAR & BATTERY PROJECTS
❌ WHITESTONE (750MW Solar) – Hills & Grid Inefficiency
Uneven terrain lowers efficiency and increases costs.
Requires long-distance transmission infrastructure to Brinsworth.
Soil erosion risk, leading to long-term environmental damage.
❌ FENWICK (237MW Solar) – Built on Floodplain & Bog Land
Soft, unstable ground increases foundation costs.
High flood risk, leading to higher maintenance costs.
Requires an 8-mile transmission feed to Thorpe Marsh BESS, adding inefficiency.
❌ TWEEN BRIDGE (Solar + 400MW BESS) – High Floodplain Risk
Located in a known flood zone—why build a battery site on a floodplain?
Flooding increases electrical damage, safety risks, and maintenance costs.
Battery storage has limited lifespan & high replacement costs.
❌ THORPE MARSH (1.4GW BESS) – Built on Landfill, Next to a Floodplain
Ground instability risks battery failure & contamination.
Flooding increases risk of chemical leaks into local water systems.
Batteries don’t generate power—they only store it for a few hours!
💰 THE REAL COST: YOU’LL PAY FOR THIS!
❗ More subsidies & higher energy bills – The government is funnelling billions in public money into these inefficient projects, while consumers will foot the bill.
❗ Expensive battery replacements every 10-15 years – Unlike gas or nuclear, these systems require constant reinvestment.
❗ Massive grid upgrades needed – The National Grid was built for coal power, not unreliable solar & battery storage.
❗ Curtailment payments = wasted money – When solar produces too much power, the grid pays developers to shut down production, costing billions in wasted subsidies.
🚜 SAVE OUR LAND – PROTECT OUR COMMUNITIES!
📢 We demand a STOP to these reckless solar and battery farm developments!
✅ What We Need Instead:
✔ SMALL MODULAR REACTORS (SMRs) at former coal sites – stable, clean energy without land destruction.
✔ Rooftop & industrial solar, not farmland destruction.
✔ Investment in nuclear & gas for grid stability, not expensive batteries.
✔ Proper land planning – no more floodplain energy disasters!
📢 TAKE ACTION NOW!
🔹 Sign the petition to stop these projects
🔹 Write to your MP demanding smarter energy planning
🔹 Share this campaign – let people know the truth
📌 SIGN THE PETITION https://petition.parliament.uk/petitions/701342
💡 The UK needs affordable, reliable energy – not expensive, poorly planned disasters. ACT NOW!

Leave a comment