Join the fight stop the destruction of the United Kingdom

Doncaster’s energy is under siege by eco-zealots pushing a net-zero scam that’s failing us!

😡 Solar farms like Fenwick and grid plans at Thorpe Marsh sound green but flop in our cloudy winters, risking blackouts and fires near the Nature Reserve, with over 26,500 residents within 5km at risk. Tween Bridge and Whitestone? More costly flops. The Conservatives ignored us; Labour’s 2030 dream is worse.

https://petition.parliament.uk/petitions/723869

BESS OR NATURE

🌪️ Let’s expose the lobbyists, reject solar, and demand nuclear power to keep Doncaster powered and safe. Here’s the truth!

💡Fenwick’s Solar Fiasco

🌧️📍 10 miles north of Doncaster, near Askern, Fenwick’s 237.5MW solar farm promises 208–250 GWh yearly for 75,000 homes.🚫

Winter’s 6-7 hours of cloudy daylight slash output to 2-5% (4–12MW). Capacity factor: 9-12%.

💸 £200M cost hits bills, no blackout protection (recall 2019’s outage!).

🌾 Ami Sett’s Action Group slams it for eating 70% of Fenwick’s farmland.

Thorpe Marsh: Grid Strain & Fire Risks 🔥

🔌 £750M upgrade with 1.4GW/3.1GWh battery system (BESS) for Fenwick and Tween Bridge.

⚡ 1960s grid can’t cope—solar swings risk blackouts. UK grid upgrade: £3T (£100k/household)!

🌿 Next to Thorpe Marsh Nature Reserve, a 77-hectare haven for kingfishers; wetlands.

🚒 BESS fire risk threatens the reserve and over 26,500 residents within 5km, including Barnby Dun and Kirk Sandall.

Floodplains complicate firefighting.

Tween Bridge & Whitestone: Solar Madness

🏭🌞 Tween Bridge (800MW, £800M, 400MW BESS): 701–841 GWh yearly, drops to 16–40MW in winter. Eats green belt�

🌾 Whitestone (750MW, £750M): Threatens Conisbrough farmland, local fury. Another winter flop.😤 Both raise bills, strain Thorpe Marsh, deliver little power.

Lobbyists Running the Show 🗣️😎 Greenpeace, Friends of the Earth, and Ed Miliband (Doncaster North) push solar despite 9-12% capacity factor.

📉 £3T grid bill, blackout risks ignored. CCC: 2030’s a stretch; NESO’s optimism is clueless.🛑 Engineers warn Thorpe Marsh can’t handle solar, but lobbyists shout louder.Government Flops:

Conservatives & Labour 🙈🏛️

Conservatives (2010-2024): Ignored Thorpe Marsh’s grid, backed Fenwick, stalled nuclear despite Hartlepool.

🌹 Labour: 2030 net-zero grid is a fantasy. £8.3B Great British Energy vs. £3T. More solar, no SMRs, job risks from oil/gas cuts.😢 Armthorpe households, Thorne businesses pay with outages, bills up 80% since 2020.

Nuclear: Doncaster’s Fix 💪⚛️ 470MW Rolls-Royce SMR near Thorpe Marsh: Powers 1 million homes, 90% capacity factor—10x solar!💼 £2B, 1,000 jobs, stable bills. Hartlepool proves it works.🛠️ Pair with £10B grid upgrades, gas bridge—no blackouts, no fires.

Doncaster’s Fightback! ✊No more eco-zealots! Here’s how we win:

📝 Sign Our Petition: Halt solar farms like Fenwick, Tween Bridge, Whitestone. Fund nuclear SMRs! Need 10,000 signatures for Parliament. Click here. http://petition.parliament.uk/petitions/701342

📧 Contact Your MP: Email Lee Pitcher (Don Valley) or Sally Jameson (Doncaster Central):

“No solar flops—fund nuclear, stop fire risks!” .

📣 Spread It: Share on Doncaster Facebook (“Doncaster People”) and X with #StopNetZeroCon.

Tag @Ed_Miliband: “Nuclear, not fire traps!”Truth Wins! 🏆Fenwick, Tween Bridge, Whitestone are lobbyist scams. Thorpe Marsh’s fire risks to 26,500 residents and £3T grid bill prove net zero’s broken. Conservatives failed, Labour’s worse, but Doncaster can fight! Wake up, force Parliament to ditch zealots, and build a nuclear-powered future.

Join reformdoncasteractionagainstnetzero.blog! Who’s in? 💥