🐓 They’ve Put the Cart Before the Horse — and an Elephant in the Cart šŸ˜

That elephant? 🐘
The national grid is full.

🚨 The Reality No One Wants to Talk About:

⚔ The grid is overloaded.
In region after region, connection queues are years long — or closed altogether.

šŸ› ļø DNOs (Distribution Network Operators) are overwhelmed.
Reinforcements are delayed, underfunded, or stuck in red tape until the mid-2030s and beyond.

🧟 We’re stacking up zombie projects.
New solar farms, wind projects, and battery storage schemes are being approved —
with nowhere to plug in.

🧯 What Good Are Targets Without Delivery?

While ministers grab headlines with Net Zero announcements, they’re ignoring the wires, substations, and transformers needed to actually make clean power usable.



There’s:

āŒ No sequencing

āŒ No coordination

āŒ No serious infrastructure plan


Just targets piled on promises, disconnected from engineering and reality.

CCC and DESNZ

šŸ“‰ It’s Fantasy Planning. And It’s Already Failing.

Every day we delay grid reform, we waste public money, overpromise capacity, and stall real delivery.

The result?

šŸ”Œ Curtailment (projects switched off to protect the grid)

šŸ’ø Cost inflation passed onto consumers

🧱 Backlogs that now stretch beyond 2035 in parts of the UK

āœ… The Bottom Line:

You wouldn’t build a house with no foundation.
You wouldn’t ride a cart with no horse.
And you shouldn’t promise power you can’t connect.

Want clean power? Fix the grid first.
Because right now, we’re not powering the future —
we’re dragging the past behind us.